Services

What leaves this office

What you can price, and what the machines can follow.

Sample AGTEK volume report, subgrade vs. existing
01

Volume Takeoff

Estimates

An accurate earthwork, site-work, and paving volume takeoff: cut and fill quantities. These quantities are estimates.

Sample bid sheet with illustrative pricing
02

Estimate / Bid Sheet

Optional

If you want it, we turn the takeoff quantities into an estimate, a bid sheet, for you. Send us your hourly equipment and labor rate sheet, and we'll build your rates into the estimate so it's priced your way. We set up the estimate with your quantities and hourly rates built in. You assign the production rates, crews and material prices for each scope of work, so the final number is yours. Estimating support is available by subscription. Ask for details.

Cut and fill site model
03

Machine Control Site Model

Once you are awarded the project, we build the site model your machine control runs on. Topcon .tp3, or Trimble on request.

Quick rough number volume summary
04

Quick Rough Number

Not for bidding

A budget number for planning and pricing, not for bidding. Reviewed before it goes out.

Jason Harrington reviews every deliverable.

All quantities are estimates, prepared from the plans and files you provide. They are not a survey, not a guarantee of field conditions, and not a substitute for your own review before you bid or build.