In the field since 1992
Jason Harrington started building roads in 1992. 34 years of dirt, grade, and paving sits behind the numbers.
How it works
Civil plans, a geotech report, specifications, KMZ/KML, a topo survey, or CAD files (DWG/DXF). Include the bid date and what you want priced.
A volume takeoff for earthwork, site-work, and paving, marked as estimates. A bid sheet if you want one. Once the project is awarded, a machine-control site model: Topcon .tp3, or Trimble on request. A quick rough number is separate, for planning and pricing, not for bidding.
Jason Harrington checks every deliverable before it comes back to you.
Why us
Jason Harrington started building roads in 1992. 34 years of dirt, grade, and paving sits behind the numbers.
Designs stay in AGTEK. Machine-control files are built in Topcon 3D-Office and delivered as .tp3. There is no second handoff.
Turnaround depends on the size and complexity of the project. Small sites, like a half-acre pad, often come back in a day to a day and a half. Large sites take longer. Tell us your bid date and we'll schedule the work to it.